CAE for hotels: what to check before a refurbishment
CAE for hotels in Spain: check eligibility, evidence, costs and grants before including an energy-saving payment in your refurbishment budget.

You are planning a refurbishment and the supplier adds “CAE income” to the budget. Before subtracting it from the investment, request the proposed action, calculation and payment conditions. A potential payment for energy savings needs a case file and a specific agreement before it becomes available cash.
This guide concerns Spain’s Certificados de Ahorro Energético system. Start the discussion before removing equipment or losing records needed to support the application.
1. What a CAE represents
One energy savings certificate represents 1 kWh of annual final energy savings from an efficiency action. The system enables savings to be monetised through their transfer. Keep that payment separate from the operational savings the improvement may deliver on future bills.
A CAE is different from the building’s energy performance certificate, the Noola A–G rating and a supplier’s savings estimate.
MITECO: how Spain’s CAE system works
2. Request an eligibility review for the specific project
Standardised actions use catalogue sheets; individual actions require their own justification. Evidence and verification form part of the file. An obligated or delegated party applies for issuance, involving an ENAC-accredited verifier and the regional administrator.
Ask for the proposed route and any missing information in writing. A quote labelled “LED”, “heat pump” or “air conditioning” is insufficient. The review needs to address the equipment, conditions and dates of your project.
- Request the applicable catalogue sheet or methodology and version.
- Confirm who reviews the case and who submits the application.
- Obtain the evidence and inspection schedule before work starts.
- Clarify ownership of the savings and any previous assignment, particularly where landlord and operator differ.
BOE: Royal Decree 36/2023 — the CAE system
3. Prepare an evidence folder before work starts
Ask the case manager which records your project requires. To prepare the commercial and technical review, gather the itemised quote, existing and replacement equipment specifications, photographs, dates, invoices, payment records and commissioning documents. This is a preparation list; the application must follow the requirements of the specific action.
Appoint someone at the hotel to coordinate the supplier, maintenance and administration. Before removing existing equipment, confirm that the necessary information has been recorded. Recovering it later may be harder than collecting it during the technical visit.
4. Negotiate the net payment and its conditions
The transfer price is freely negotiated. Public support is generally compatible except where funded through the FNEE; requested or received grants must be declared. Review the specific grant’s rules and limits with the case manager as well.
MITECO: FAQs, pricing and compatibility with grants
Request an offer that answers these questions before adding the payment to your budget:
- Is the figure indicative or contractually committed, and on what conditions?
- Which processing and verification costs are deducted, and who pays if the application fails?
- When is payment due and what triggers it?
- What happens if fewer savings are recognised than expected?
- Does the agreement include exclusivity, further assignments or commitments affecting other improvements?
5. Assess the refurbishment under two scenarios
Prepare one scenario with the complete investment and estimated operational savings, excluding a pending CAE payment. In a second, include the documented net compensation and expected timing. If the project is only viable with that payment, eligibility and contract review become central to the decision.
This keeps an uncertain receipt from being treated as cash already available. It also makes supplier offers comparable: the same scope, cost basis and treatment of grants and compensation.
Noola provides a starting point for identifying and organising opportunities using bills and information about the hotel. This analysis does not replace CAE eligibility review or the system’s verification requirements.
Official sources consulted on 18 November 2026. Check the legislation, catalogue sheets and applicable terms when preparing your case.